AAIB investigation to Boeing 737-377, G-CELF
Published on 10 December 2014, 22:57
- Summary
- Electrical failure, on departure from Leeds Bradford Airport, 2 August 2013.
- aircraft category
-
commercial-fixed-wing
- aircraft type
- Boeing 737-377
- bulk published
- 1
- date of occurrence
- 2013-08-02
- location
- On departure from Leeds Bradford Airport
- registration
- G-CELF
- report type
- field-investigation
Report Overview
Summary:
The aircraft suffered an electrical failure after departure, which led to the loss of the commander’s primary flight instruments, navigation equipment and other electrical services. There was also a smell of electrical burning in the passenger cabin, so an immediate return to the airport was carried out.
The loss of power was caused by a fatigue failure of the terminal lug on the end of the No 1 generator phase ‘A’ ground cable. An inspection revealed a number of other lugs which had cracked in the same location, two of which were close to failing in the same manner. The lugs had probably cracked as a result of a combination of engine vibration, a rough surface finish and bending of the lug during installation.
This overview has been truncated. Please refer to the official documents below for the complete canonical report.
Official Documents
-
Boeing 737-377 G-CELF 08-14.pdf
Document Content Preview
Extracted text from the first few pages of the official documents.
Boeing 737-377 G-CELF 08-14.pdf
Text truncated. The original document has 19 pages.
Change History
-
First published.
Related Entities
Search the database for other reports involving these entities.