Mrs T Sarwar v Barnardo's: 3200539/2017
Employment Tribunal
Published on 07 September 2018, 09:05
- Summary
- Employment Tribunal decision.
- categories
-
unfair-dismissal
- country
- england-and-wales
- decision date
- 2018-08-24
Official Documents
-
Mrs T Sarwar v Barnardo's: 3200539/2017 - Full
Decision Content
Read the full decision in .
Change History
-
First published.
Full Decision Text
Raw text extracted from the official documents.
The unanimous judgment of the Employment Tribunal is that:-
1. The Claimant made protected disclosures in her email of 23 December
2016 and her first email on 5 January 2017 (the latter in respect of product
safety only).
2. The Claimant was subjected to a detriment because of a protected
disclosure when she was not given the supplier responses to her
questions, when she was not supported by Mr Clark in respect of an
offensive email from the supplier and when Mr Clark called her a blocker.
3. The detriments extended over a period continuing until the Claimant’s
resignation on 5 February 2017.
4. The Claimant was entitled to resign and treat herself as dismissed by
reason of the Respondent’s conduct.
5. The dismissal was dismissed contrary to s.98 Employment Rights Act
1996 but was not contrary to s.103A Employment Rights Act 1996.
Case Number: 3200539/2017
2
REASONS
1 By a claim form presented on 12 June 2017 the Claimant brings claims of
detriment and/or unfair dismissal which she says was principally because of protected
disclosures. The ACAS early conciliation period lasted from 8 February 2017 until 22
March 2017 (six weeks). The Respondent resists all claims. It was agreed that this
hearing would deal with liability only.
2 The issues were agreed between the parties in a List dated 11 March 2018 and
were further clarified during the course of the hearing. We referred to the full list as
agreed but, for ease of reading in this Judgment, they may be summarised as:
2.1 Did the Claimant make a protected disclosure on any of the following
dates?
(1) 23 December 2016: email to Mr Clark regarding the Teletubbies
contract;
(2) 5 January 2017: email regarding the Teletubbies contract;
(3) 5 January 2017: email to Mr Clark regarding the DHX contract.
2.2 Did the Respondent subject the Claimant to any of the following
detriments because of the disclosure(s)?
(1) Undermining the Claimant by failing to allocate to her duties and
decisions which would previously have been within her remit (PC
para 29). Specifically, failing to share with her all but one of the
responses of the supplier and/or failing to share with her the
internal actions proposed in respect of her email of 5 January
2017.
(2) Undermining the Claimant to external suppliers, namely Louis
Kennedy, the supplier of the Teletubbies contract (PC para 30).
Specifically, Mr Clark’s failure promptly to respond to Mr Morgan’s
email of 3 January 2017 despite it being copied to the Claimant
and her work colleagues and/or the tone and content of Mr Clark’s
email of 13 January 2017 to Mr Morgan asking for a note of
apology to be sent.
(3) Mr Clark referred to the Claimant as a “blocker” at a meeting on 12
January 2017, at which a junior member of HR staff was present
(Further Information, para 4.4).
2.3 Was the Claimant entitled to treat herself as dismissed by reason of
conduct by the Respondent amounting to a repudiatory breach of the
implied term of trust and confidence? The Claimant relies on the
following conduct:
(1) The decision of Mr Clark on 2 August 2016 to close the Wickford
office without prior consultation;
Case Number: 3200539/2017
3
(2) The decision of Mr Clark not to sign off the job descriptions of the
Claimant’s team despite these having been agreed by his
predecessor;
(3) The failure by Mr Clark to consider a new job description for the
Claimant in a timely way or at all;
(4) Bullying and intimidating management style in meetings with the
Claimant;
(5) Despite a grievance and appeal about being sidelined by Mr Clark,
the Claimant was excluded from the Teletubbies project until a very
late stage;
(6) Failure properly to investigate the Claimant’s grievance or appeal;
(7) Preventing the Claimant from exercising her proper role in respect
of the Teletubbies project as a consequence of her grievance;
(8) Failure to have any or any reasonable regard to the Claimant’s
many concerns about the Teletubbies project;
(9) Describing the Claimant as a “blocker” at a meeting;
(10) Failure to permit the Claimant to review the supply contract on the
Teletubbies project, despite this being part of her normal remit;
(11) Undermining the Claimant to the supplier on the Teletubbies
contract.
2.4 Did the Claimant resign in response to any such breach?
2.5 If so, was the sole or principal reason for dismissal that she made any or
all of the protected disclosures?
2.6 Were the claims or any of them presented within the prescribed period or,
if not reasonably practicable, within a reasonable period thereafter?
3 We heard evidence from the Claimant on her own behalf. For the Respondent,
we heard evidence from Mr Roy Clark (Director of Retail and Trading), Ms Lisa
Freshwater (Human Resources) and Ms L Parkes (Corporate Director of Income and
Innovation). We were provided with an agreed bundle of documents and we read
those pages to which we were taken in the course of evidence.
Findings of fact
4 The Respondent is a well-known charity raising money from fundraising
initiatives and its network of shops to help children throughout the United Kingdom.
Barnardo shops sell three types of goods: those donated by members of the public,
surplus stock gifted from other retailers or companies and new goods such as cards or
fake flowers. New goods are sourced and purchased wholesale through Barnardo’s
Trading Limited (“BTL”) a separate legal entity registered at Companies House. These
new goods are sold in the shops, on-line and through mail order catalogues. The
profits generated by BTL are gifted to the Respondent.
5 The Claimant commenced her employment with the Respondent on 9 January
1995, initially working as a buying controller, she was Head of BTL at the date of her
resignation. The Claimant was a statutory director of BTL. Ms Parkes was also a
director of BTL. The Director of Retail and Trading would usually be appointed as a
Case Number: 3200539/2017
4
further statutory director of BTL but, as he was still in his probationary period, Mr Clark
had not yet taken up that role.
6 When the Claimant started her employment, BTL sourced new goods from a
range of suppliers largely being produced in China. As time passed, and with the
knowledge of the directors of the Respondent then in post, the number of BTL
suppliers reduced until in recent years BTL dealt exclusively with Creative Tomco Ltd.
7 There was no up to date job description for the Claimant’s role. Her evidence
was that she was responsible for sale of new goods through retail shops, decisions on
product range, saleability, price and the ethical considerations of production in Chinese
factories. The Claimant had been appointed by the Respondent as a champion on
modern day slavery issues. The Claimant’s evidence was that she was also
responsible for product testing and sign off under UK and EU regulations, product
packaging and labelling requirements from a health and safety perspective, agreeing
commercial terms, bar coding products, sample testing sign off, production of artwork
and packaging, shipping, safety assurance, logistical dispatch to the shops for sale and
licensing arrangements. On this latter aspect, the Claimant liaised with IQS an
external specialist which provided advice on safety and technical matters.
8 Initially, the Respondent disputed the wide range of duties described by the
Claimant as falling within her remit. However, in the course of his evidence, Mr Clark
accepted that those were duties undertaken by the Claimant in her dealings with
product supplied by Creative Tomco Limited. These included sign-off on factory audits
and product testing. The Respondent’s case was that the Claimant’s role was more
limited on the Teletubbies contract to which we shall return.
9 The Claimant managed a team of three employees in BTL: Ms White, Ms Vary
and Mr Anderson. The Claimant reported to the Director of Retail and Trading. At the
time of her resignation, this was Mr Clark. In turn, the Director of Retail and Trading
reported to the Corporate Director of Income and Innovation, this was Ms Parkes.
There had been a large amount of management turnover at the Respondent in 2016.
Mr Gerard Cousins left his post of Director of Retail and Trading in December 2015,
the post was filled by Mr Chris Judd until he left in July 2016 and Mr Clark appointed
from August 2016. Ms Parkes had only been in post since January 2016. The effect
was that only the Claimant and one other employee on the Retail Management Board
had over a years’ service by late 2016.
10 Given the Claimant’s experience and knowledge of the business and the
changeover in her managers, the Claimant had almost total autonomy in the day to day
running of BTL. The Claimant was accountable for BTL’s performance at regular retail
and trading meetings. There was no evidence before us to suggest that the
Respondent was unhappy with the management of BTL prior to late 2016. BTL was
generating a healthy profit and there was no suggestion of underperformance before
the appointment of Mr Clark.
11 The Respondent operates a job evaluation process aimed at objectively
assessing the weight and appropriate financial remuneration for its jobs. The process
required that there be a new job description written; an evaluation request form
completed and an independent evaluation by the Pay and Reward team. If satisfied
Case Number: 3200539/2017
5
that there had been a significant change in the content, level of responsibility and/or
method of working in a job, the Pay and Reward team would recommend a regrade
which would then be discussed by the Corporate Leadership Group Member and
relevant line manager. If the evaluation was accepted, the approval form would be
authorised and returned to Pay and Reward for implementation.
12 Each of the three members of the Claimant’s team had been through the
process; and by November 2015, the Pay and Reward team had recommended that
each be regraded. The relevant decision maker was the Director of Retail and Trading.
Prior to their departures, neither Mr Cousins nor Mr Judd had made a decision to
accept or reject the evaluation and it remained outstanding at the commencement of
Mr Clark’s employment.
13 The Claimant also considered that her job required re-evaluation. She had
written a job description but this has not yet been agreed and no evaluation request
had been submitted.
14 The Claimant had her annual performance appraisal in June 2016. Whilst the
Claimant drafted the content of the appraisal, it was signed off by Mr Judd on behalf of
the Respondent. We infer from his signature that he agreed with the content of the
Claimant’s draft. The appraisal describes the Claimant’s specialist skill base in product
sourcing, range planning and development, negotiation and procurement as well as her
role in safeguarding and ensuring that new goods and products comply with EU and
UK standards, as well as her membership of the retail management board. The
manager’s feedback is positive, commends her contribution to the retail management
board and thanks her for a successful year for BTL.
15 Mr Clark took up his role as Director of Retail and Trading on 1 August 2016.
He and the Claimant met on 2 August 2016. Whether it is termed a “meet and greet”
or a formal 1:1 matters little, in substance it was an initial meeting in which each
introduced themselves to the other and the Claimant gave a brief overview of the BTL
business to Mr Clark. The Claimant raised a number of issues, including her
outstanding job description, the re-evaluation process for her team and the fact that the
lease on the Wickford office had expired. The meeting was pleasant and calm, as one
would expect from an initial meeting of this sort.
16 Following the meeting, the Claimant sent Mr Clark an email in which she
provided further information about the BTL operation and also provided a copy of the
Wickford lease.
17 The Claimant and Mr Clark next met on 12 August 2016 when Mr Clark visited
the BTL offices in Wickford. The Claimant showed Mr Clark around the office and they
discussed key products, the business supply chain and future opportunities for BTL,
including diversifying and increasing the range of products offered. There is a dispute
of evidence as to what happened when the Claimant and Mr Clark returned to her
office.
17.1 The Claimant’s evidence is that Mr Clark told her that he had made a
decision not to renew the lease at Wickford but intended to relocate the
BTL team to Barnardo’s House in Barkingside. He gave as his reasons
Case Number: 3200539/2017
6
the immediate cost saving on rent and the desirability of the BTL team
being based with the broader retail and trading team. Mr Clark could not,
or would not, say if or when the BTL team job descriptions and reevaluations
would be progressed. The Claimant was shocked at the
bluntness with which Mr Clark presented this information as a “done deal”
in the last 10 minutes of a site visit which had lasted for over two hours.
17.2 Mr Clark’s evidence is that he told the Claimant that he was thinking of
not renewing the lease and wanted to hear her views but, as it was a
Friday evening, they would talk about it at their scheduled 1:1 meeting
the following week. Mr Clark told the Claimant that he would not sign off
the revised job descriptions until he found out more about BTL. Mr Clark
denied that telling the Claimant that he had made a decision not to renew
the lease or that he was blunt, rather he was careful to be diplomatic in
the way that he expressed himself.
18 On balance, we prefer the evidence of the Claimant. In his evidence, Mr Clark
described the Wickford offices as exceptionally plush and not what he would expect of
a charity satellite office. That is consistent with the Claimant’s evidence that Mr Clark
told the Claimant that he wanted cost savings. The manner in which Mr Clark gave
evidence to this Tribunal, and his admission that he did make a “like it or lump it”
comment in a later meeting, are consistent with a manner of expression which was
blunt and decisive rather than open and consultative. This was consistent with later
evidence about a retail and trading strategy plan in January 2016 which Mr Clark
maintained was a draft but which Mr Clark’s email objectively considered gave the
impression of being a concluded plan. On balance, whilst we accept that Mr Clark may
have intended only to convey his preliminary thoughts in order to obtain the Claimant’s
views about closing the Wickford office, the way in which he expressed himself clearly
conveyed to the Claimant the impression of a decision that had been definitely taken.
Mr Clark also, we find, told the Claimant that he could not sign off or progress the job
descriptions and re-evaluations at such an early stage in his employment.
19 The next 1:1 meeting took place on 17 August 2016. The Claimant explained in
a passionate manner her disappointment about the lack of progress on the job
descriptions and her team’s experience of a previous move to Barkingside, which had
not proved successful due to the impracticalities of travel leading to a move to
Wickford. There is again a dispute of evidence. The Claimant says that Mr Clark said
that he would think about her presentation but that his intention remained unchanged
to relocate BTL to Barkingside. The Claimant describes Mr Clark as very forthright in
his management style during the meeting, “eyeballing” and wagging his finger at her in
a manner which she said intimidated her. Mr Clark did not give any great degree of
detail about the meeting. He denied “eyeballing” and finger wagging, stating that he
simply thanked the Claimant for her feedback which he would take away and give the
matter further thought.
20 Again, on balance, we prefer the evidence of the Claimant. We noticed that on
at least three occasions during the course of cross-examination, Mr Clark displayed
behaviours and gave answers which demonstrated a degree of irritation when he felt
that his decision making was being challenged. For example, when put that he should
have brought the Claimant into a later conversation with the CEO of a logistics
Case Number: 3200539/2017
7
company, his blunt response was “that’s your view; it didn’t happen and I’ve told you why”.
Similar questions about why the Claimant had not been provided with product test
reports on the Teletubbies project, elicited a blunt and, we felt, dismissive reply that: “I
had been given reassurances; why would I need to check in on everything with Tracey Sarwar”.
The meeting on 17 August 2016 was emotionally charged and revealed a significant
difference of opinion. The Claimant was passionate about what she regarded as best
for her BTL team. Mr Clark was irritated at being challenged and what he perceived as
the Claimant’s resistance to his new ideas. He was blunt and dismissive, although we
would not go so far as to characterise this as bullying and intimidating.
21 Also on 17 August 2016, the Claimant was told by Ms Parkes that the BTL
board meeting scheduled for the following week had been cancelled. Ms Parkes was
considering more generally whether or not the Retail and BTL board meetings should
be merged. The Claimant did not agree that this would be desirable.
22 The next 1:1 meeting between the Claimant and Mr Clark took place by
telephone on 22 August 2016. Mr Clark asked the Claimant to provide him with the
BTL key performance indicators, told her that he was setting up a strategy group to
shape retail and trading strategy and said that it was important that she be a part of it.
There was discussion about the Claimant’s imminent annual leave and about the
practical logistics of a move to Barkingside. Again the dispute in the evidence is about
the interpretation to be drawn from the conversation and the manner in which it was
conducted. The Claimant says that the request for KPIs was inappropriate as it had
already been agreed that they would be discussed in September and that Mr Clark was
pressing forward with the move without proper consultation and consideration of her
objections. By contrast, Mr Clark believed that the Claimant was defensive about the
KPIs and listed aggressively the reasons why BTL could not move to Barkingside.
23 These differing perceptions of the discussion are in our view indicative of the
deteriorating nature of their working relationship and their inability to communicate
without misunderstanding. We find that Mr Clark was genuinely frustrated at the
Claimant’s resistance to what we consider a reasonable and proper request for the
KPIs to be sent before the planned discussion. Equally we find that the Claimant was
genuinely frustrated by Mr Clark’s plan for the move despite her reasoned objections
and in light of a decision which he had given the impression had already been taken.
We do not accept that this was bullying or an intimidating management style by
Mr Clark in this meeting, simply a genuinely held difference of opinions and a lack of
sensitivity on the part of Mr Clark as to how his earlier comments and manner could
reasonably have been interpreted.
24 On 25 August 2016 Mr Clark telephoned the Claimant to say that the only
practicable dates for the strategy days fell within her annual leave, namely 13 and 14
September 2016. He had made the decision to go ahead in her absence as the next
available date would be much later and this was an important event. The Claimant
accepted that Mr Clark apologised and assured her that he would come to Wickford for
the Christmas launch and would brief her on the intended agenda in advance of the
strategy days. The Claimant decided that two members of her team would attend on
one day each.
25 The Christmas launch was held at Wickford on 30 and 31 August 2016. It was
Case Number: 3200539/2017
8
attended by about 40 to 50 people, including Mr Clark, the BTL team, members of the
retail team and representatives of the company responsible for logistics. The Claimant
and the BTL team had put significant effort into the arrangements for the event,
including overnight accommodation and an evening meal. The Claimant made a
presentation for which Mr Clark congratulated her. In her subsequent grievance, the
Claimant complained that Mr Clark did not speak to her at all, excluded her from his
lengthy conversation with the CEO of the logistics company and did not brief her on the
forthcoming strategy days as promised but instead discussed future strategy ideas
directly with two members of her team. The Claimant felt that she was being
deliberately ostracised and sidelined. Mr Clark denied that he had ostracised the
Claimant at all. The issues in this hearing do not include the conduct of Mr Clark at the
evening meal but the Claimant does rely upon the handling of her grievance.
26 The strategy days took place on 13 and 14 September 2016 attended by Mr Jeff
Anderson and Ms Clare Vary on behalf of BTL. From early 2016, the Respondent’s
fundraising team had been in negotiations to enter into a licensing agreement with
DHX to use the Teletubbies brand in support of a number of fundraising events
including “The Big Toddle”. By September 2016, the Respondent was considering
extending the range of the project to include sale of Teletubbies gift items in its shops
although at this stage specific products had not been decided. On 16 September
2016, Mr Clark sought feedback about which products might be sold. The email was
sent to those attending the strategy days where the Teletubbies project had been
discussed; it was not sent to the Claimant. Mr Anderson replied to the email,
suggesting six lines which could work well, nine that may not and the possibility of
some cards. Mr Anderson said that he would need to speak to the Claimant upon her
return from holiday.
27 Another strategy day attendee, Mr Charlie Enright, also emailed feedback.
Under the heading “new goods”, Mr Enright referred to the possibility of stocking a
small range of paper products such as children’s cards, gift bags and wrapping paper.
Mr Clark copied the email to Mr Anderson, asking him to note the comments about new
goods. Shortly afterwards, and without input from the Claimant, the Respondent
agreed the Teletubbies product range which would be sold in its shops.
28 On 20 September 2016, immediately upon her return from holiday, the Claimant
submitted a detailed written grievance setting out her concerns about the conduct of Mr
Clark since their first meeting on 2 August 2016 and culminating at the launch party. In
her grievance, the Claimant complained that Mr Clark had breached internal policies,
failed to treat her as a senior manager, instead showing a total disregard for her role,
opinions, wealth of experience and length of service. The Claimant complained that
the relocation was being forced through without proper consultation, that it was not
practical or in the best interest of the business. She was concerned about the
continual delay in job descriptions and erosion of BTL board meetings. The Claimant
described feeling bullied by Mr Clark’s approach, his blunt management style and
scare tactics and excluded by his deliberate attempts to network directly with her team
at the launch and strategy days. The Claimant believed that Mr Clark and more senior
managers were colluding to undermine her position so as to force her out of the
organisation.
29 Mr Adam Pemberton was appointed to hear the grievance. He interviewed both
Case Number: 3200539/2017
9
the Claimant and Mr Clark on 27 September 2016. The Claimant repeated her
concerns; Mr Clark refuted the Claimant’s complaints. In her interview with Mr
Pemberton, Ms Parkes stated her belief that Mr Clark had quickly started to form a
view that a move from Wickford would bring financial and operational benefits but
maintained that he had not yet made a decision. Ms Parkes suggested that Mr Clark
considered the Claimant’s initial concerns to be emotional rather than business driven.
The job evaluation process had not progressed as it had been left with previous
managers; the merger of the quarterly BTL board meetings with the weekly retail
meetings would be a more efficient use of time as a lot of information was repeated.
Mr Pemberton did not interview Ms Vary or Mr Anderson; the Claimant did not suggest
that he should do so.
30 By a letter dated 3 October 2016, Mr Pemberton did not uphold the grievance.
Overall, Mr Pemberton preferred the evidence of Mr Clark to that of the Claimant but
he did not give reasons for doing so. Given the nature of the Claimant’s concerns, it
would have been preferable to set out his key reasoning. In failing to do so, the
grievance decision gave the impression that he had simply preferred the evidence of
the more senior Mr Clark rather than the Claimant who had given many years of
service without prior problems in her working relationship with her managers. This
added to the Claimant’s sense that she was not being valued or listened to by senior
managers. One of the outcomes of the grievance recommendations was to propose
that there be mediation between the Claimant and Mr Clark. The Claimant wished to
consider her position on appeal and to be provided with additional information as to
what would be involved. A proposed mediation on 18 October 2016 therefore did not
proceed.
31 On 5 October 2016, two days after the grievance decision, the Claimant and
members of her team received a letter from the Respondent informing them that there
would be a period of consultation about the proposed move from Wickford. Although
the grievance decision letter stated that a formal consultation about the move would
should commence as soon as possible, Mr Clark did not speak to the Claimant about it
before the letter of 5 October 2016 was sent. The Claimant was surprised to have had
no proper forewarning and regarded it as a further example of her seniority being
undermined. Although not relied upon specifically as a breach of the implied term of
trust and confidence, the Tribunal considered that this was indicative of the poor
communication shown by Mr Clark towards the Claimant. Given her position, it was
inevitable that more junior members of the BTL team would approach the Claimant with
questions. Courtesy and good industrial practice would have been for Mr Clark to tell
the Claimant that the letter was being sent out and even to provide her with an
advance copy of the consultation document.
32 The consultation was undertaken as a non-redundancy exercise despite the
proposal being the cessation of the BTL operation at Wickford. The Respondent’s
consultation document set out the perceived operational benefits of a relocation but did
not address the concerns previously raised by the Claimant. The BTL team asked to
be accompanied by the Claimant in their consultation meetings. The Respondent
refused, claiming that it may put the staff in a difficult position. The Tribunal did not
regard this explanation as credible not least as it was the wish of the BTL team. We
infer that it was borne of Mr Clark’s desire to limit the Claimant’s direct involvement
given her opposition to the proposal. Following consultation, the Respondent accepted
Case Number: 3200539/2017
10
that the relocation should not proceed. No new lease at Wickford was signed as
negotiations with the landlord were ongoing, although the Claimant was not kept
informed about the progress of these negotiations.
33 Following submission of the Claimant’s grievance, the 1:1 meetings between the
Claimant and Mr Clark ceased. They continued to have direct contact at the weekly
retail and trading meetings and HR advised Mr Clark that even without 1:1 meetings
there were other means of communication with the Claimant. We agree. The working
relationship between Mr Clark and the Claimant needed to continue and the temporary
suspension of 1:1 meetings is not a good reason for a failure to communicate between
senior managers.
34 The Claimant’s grievance appeal was heard by Mr Tony Cripps. Other than
interviewing the Claimant on 2 November 2016, Mr Cripps undertook no further
investigation and decided the appeal on the evidence already available. Mr Cripps
concluded that the relationship between Mr Clark and the Claimant was at the heart of
her feelings that she was being sidelined and ignored but that there had been no
bullying. Mr Cripps found that Mr Clark had a different leadership style from the
Claimant’s previous managers. Mr Cripps concluded that the Claimant may have to
adjust as the working relationship developed. We agree with those conclusions with
the exception that the relationship of trust and confidence is mutual. It was not entirely
the responsibility of the Claimant to adjust in order to accommodate Mr Clark, both
bore responsibility for developing and maintaining a professional working relationship.
35 It is against those existing tensions in the working relationship that the
Teletubbies project must be considered. This was a significant initiative for the
Respondent. It had no dedicated project team but involved employees from a number
of its teams as and when required. The Respondent was working with a third party
company, Louis Kennedy, which had entered into a licensing agreement with DHX
which owned the rights in the Teletubbies brand. Mr Grant Morgan worked for Louis
Kennedy.
36 Following the discussion at the strategy days and subsequent emails, there was
occasional mention of the Teletubbies project in the retail and trading team meeting.
For example, on 18 October 2016 it is noted that Mr Clark and the Claimant would
meet to discuss logistics once the Teletubbies contract was signed. The Claimant’s
case is that she understood at this time that the role of BTL and new goods would be
limited to a small range of paper products with all other products being donated or gifts
in kind. This belief is consistent with the emails from Mr Anderson and Mr Enright
following the strategy days.
37 By 8 December 2016, the discussions between the Respondent and Grant
Morgan had progressed to a point at which the supplier was ready to start production
and the Respondent intended to make a payment in advance. As purchase approval
for stock fell within the remit of BTL, on 13 December 2016, Ms Parr-Morley (the
Finance Director) sent the Claimant an email requesting that asking her to talk to Ms
Makesia Simmons (a member of the internal finance team) about an urgent request to
make payment that week. This was the first time that the Claimant was directly
involved in the Teletubbies project. The following day, the Claimant was asked to give
a decision and approval for purchase of the Teletubbies stock that very day.
Case Number: 3200539/2017
11
38 Over the same period from 8 to 14 December 2016, the Claimant was asked by
a colleague in Retail about the services provided by MMC in the context of a visit by Mr
Clark to discuss Teletubbies. From this we infer that Mr Clark intended to use MMC to
provide the logistics and delivery of Teletubbies products but had not discussed his
intention with the Claimant directly.
39 The Claimant was concerned that she was being asked at short notice to
approve a significant payment for stock which she effectively knew nothing about. On
14 December 2016, she sent an email to Mr Clark in which she expressed her concern,
raised a number of questions about terms of business and sought further information
about the production, testing and supply arrangements. The following day, Mr Clark
forwarded the email to Mr Morgan so that they could prepare answers in advance of a
meeting planned for 20 December 2016.
40 On 15 December 2016, and before any reply to her initial questions, the
Claimant asked for further information in advance of the meeting with Louis Kennedy.
In particular, the Claimant wanted to see pre-production samples, test certification,
terms and conditions of the licence with Teletubbies and copies of the internal and
external communications about the project to date. This email was also forwarded to
Mr Morgan. Later that afternoon, Mr Clark told the Claimant that she would receive
answers the following day.
41 On 15 December 2016, Mr Morgan emailed his responses to the Claimant
questions in both emails. The email responses were sent to Mr Clark and Ms Parkes
but not to the Claimant. Mr Morgan believed that the Claimant was trying to expose
procedural flaws and a lack of due diligence in the process to date, nevertheless his
responses were detailed and sought fully to address the Claimant’s concerns. Despite
assuring the Claimant that she would receive answers to her questions, Mr Clark did
not forward a copy of Mr Morgan’s responses to the Claimant nor did he provide her
with pre-production samples and the licence agreement which were already in the
Respondent’s possession.
42 The Claimant’s evidence is that the questions raised were directly relevant to
her normal role in BTL for stock purchase approval. The Respondent’s case is that
whilst these matters would have been part of her normal role, the Teletubbies contract
was different and matters such as terms and conditions of the contract, payment terms
and the like sat with the company secretary and/or external lawyers. Mr Clark’s
evidence was that the Claimant’s advice was sought only because those in finance
were new in post and did not know the appropriate process.
43 On balance, we prefer the evidence of the Claimant. In her email on 13
December 2016, Ms Parr-Morley accepted that the Claimant was responsible for stock
purchase and approval for retail and asked her to advise whether she was able to
progress the order. In her further email on 15 December 2016, Ms Parr-Morley
thanked the Claimant for her responses and expressed her gratitude that suitable
processes were in place. These responses are not consistent with the Respondent’s
case that stock approval and due diligence were not part of the Claimant’s role on
Teletubbies and that she was being asked only for advice. We do not find it credible
that, as he suggested for the first time in cross-examination, Mr Clark advised Ms ParrCase
Number: 3200539/2017
12
Morley that she was mistaken in her understanding of the Claimant’s role yet did not
clarify the position in writing or with the Claimant at all. Nor is the Respondent’s case
consistent with the Claimant’s statutory responsibilities as a director of BTL given that
the payment for stock would be made by BTL. On balance, we find that stock
purchase and approval even on the Teletubbies contract would form part of the
Claimant’s ordinary job duties even if these may be as part of a larger team given the
importance and broader nature of the initiative.
44 The meeting on 20 December 2016 was attended by the Claimant, Mr Clark, Ms
Vary, Mr Morgan and his colleague, Ms Julie Geller. Ms Vary took notes and produced
an agreed list of 16 action items. There were wide-ranging discussions about various
aspects of the Teletubbies purchase order, in particular health and safety concerns
about certain products, testing, payment terms, the breakdown of product costs,
purchase order quantities, licensing issues, the product range, quality control and
branding. It was agreed that the Claimant would review queries about product testing
requirements, be provided with a copy of the DHX licence agreement by Mr Clark, be
provided with a full set of samples prior to mass production and be provided with other
additional reports including bills of materials, safety assessments, declarations of
conformity and ethical and technical factory audits as well as breakdown of cost prices.
Ms Simmons was tasked with finalising the contract with the company secretariat and
supplying it to Mr Clark.
45 We find that this meeting clarified the respective roles of those involved. It was
clearly intended that the Claimant would be provided with the listed reports to review
them as would ordinarily be part of her role; this included ethical and technical factory
audits, quality assurance, testing and health and safety matters. Whilst ordinarily the
Claimant would be involved in negotiation and agreement of commercial terms for BTL,
given the size and nature of the Teletubbies project, responsibility was passed to
finance and the company secretariat. Mr Clark was the person who would sign on
behalf of the Respondent. This was an agreed action item and there is no evidence
that the Claimant objected at the time.
46 In accordance with the agreed action items, the Claimant thereafter entered into
direct communication with Louis Kennedy with regard to the arrangements for testing
and packaging matters such as bar codes and declarations. Emails between Ms Geller
and the Claimant on 21 and 22 December 2016 were detailed and professional even if
the two were not always in agreement. Where the Claimant raised a question, Ms
Geller provided the relevant information. As a result, a number of issues surrounding
testing and production were satisfactorily resolved.
47 Upon receipt of the 6 page email with the notes of discussions and list of action
items, Mr Clark’s response to the Claimant (in full) read: “Thanks for sending through the
action points, I won’t be send[ing] TS the DXL contract, I don’t have it as it sits with Forbes
[Mutch]”. We considered the blunt response to be consistent with our earlier findings
about Mr Clark’s style of communication with the Claimant.
48 From the afternoon of 22 December 2016, when Ms Geller left for the Christmas
holidays, Mr Morgan became involved in communications with the Claimant about
packaging and testing. There was a significant dispute as the Claimant wanted the
products to have four-digit bar codes and to be nickel free, whereas Mr Morgan did not
Case Number: 3200539/2017
13
agree as it would increase cost. On 23 December 2016 Mr Clark intervened. He did
not discuss the issues with the Claimant before sending an email to her and Mr Morgan
in which he stated that there was no requirement for a four-digit code or to be nickel
free especially if it led to additional cost. Mr Clark added: “I expect this note will now give
clarity and that all outstanding issues have been resolved and both parties can move on”. We
find that in his email, Mr Clark was deciding the dispute in Mr Morgan’s favour.
49 On 23 December 2016 at 13:28 the Claimant sent an email to Mr Clark, copied
to Ms Simmons, titled “PRIVATE & CONFIDENTIAL: TELETUBBIES”. This is said to
be the first of the protected disclosures. The Claimant relies upon six phrases
(underlined) in the following passages from this email as information tending to show a
breach of a health and safety obligation:
“One of my major concerns as expressed during Tuesday’s meeting with the supplier is
around product health and safety. As the UK’s largest Children’s charity, I know you will
agree our utmost concern is the welfare and safety of children. However after days of
exchanging communication with the supplier regarding product testing and labelling, it is
now clear that the supplier’s product test standards fall short of our own requirements. As
just one example this morning regarding the nickel testing, the supplier is insisting that
there is not a requirement for nickel free product for items that do not touch the skin. I
have now rechecked this with our external technical advisors and in our opinion based on
the latest definition of prolonged contact with the skin set by the EU Commission, the items
will be in contact long enough and that is why we have specified the test. However if all
metal components are the same material from the same source one test may be possible.
The factory/factories and the supplier need to confirm this. It is concerning that product
labelling artwork has been produced ahead of product testing and both approved without
any independent review and approval on behalf of Barnardo’s. This is not the normal
procedure that my team would follow when sourcing products.
Although there was pressure during the last week to pay 100% of the order in advance
ahead of mass production commencing the following week … at this point in time the
supplier had not confirmed the test standards to which the products would comply. Due to
the time pressures on the project I have asked for alternative documentation to be
provided but no pre-production certification which should be available at each factory has
been supplied or alternately certification for similar products as this would provide in the
short term some assurance.
Given that the 8 items are sourced from 6 different factories in China and without anyone
internally having sight of factory ethical and technical standards, this is worrying.
Furthermore the supplier is unable to provide BTL a full set of prototype samples branded
to Teletubbies …
…..
At this point, I refer also to the question I posed to the meeting on Tuesday and asked as to
everyone’s thinking about the selected product range given that 7 out of 8 items were now
known not to be suitable for children under 36 months. As the products are to be licensed
to Teletubbies, a brand that targets an audience of a pre-school age, are we really
comfortable that the products will therefore only be legally saleable to only 20% of this
target audience?”
50 The Claimant asked Mr Clark to understand the reasons why she was not
comfortable or able from a product point of view personally to authorise the order. She
Case Number: 3200539/2017
14
stated her opinion that the risks outweighed the benefits and that she would be failing
in her stewardship and governance responsibilities were she not to make her views
known. The Claimant asked that the email be treated in the strictest of confidence and
not forwarded to the supplier, as her earlier emails had been.
51 Mr Clark did not respond to the Claimant’s email on 23 December 2016. This is
not surprising at it was the last working day before Christmas. However, he did not
acknowledge her concerns in his emails sent on 28 and 29 December 2016 either.
There was little, if any, progress on the project until the return to work on 3 January
2017.
52 On 3 January 2017, the Claimant provided Mr Morgan with some amendments
to the information to be included on the packaging and raised the effect of the
introduction of the new £1 coin on the trolley token product.
53 Mr Morgan did not welcome the Claimant’s emails. In an email sent at 22.33 on
3 January 2017 to his colleague Ms Geller but copied to the Claimant, Mr Clark, Ms
Simmons and Ms Vary, Mr Morgan stated that he refused to have the project “further
delayed or derailed through churlish questions, provocation, a lack of knowledge or possibly even
all of the above”. We find that these comments were clearly aimed at the Claimant and
her role on the project.
54 In an email sent to Mr Clark and Ms Parkes at 23.48 on 3 January 2017, Mr
Morgan went further, stating:
“I am now fast losing my patience with this woman and I will not allow her to delay or
derail the process and harm potential and significant Barnardo’s income simply because it
wasn’t “invented here”.
She is provocative, ignorant and not versed in the subject in which she professes to be an
expert. She is making a simple process overly complicated and is far from a team player.
I hope you don’t find my email offensive but she needs to know that her, now beyond,
unacceptable behaviour will not be tolerated.”
This second email was not copied to the Claimant who did not see it before its later
disclosure in these proceedings.
55 The Respondent accepts that both of Mr Morgan’s emails were inappropriate
and offensive. The first email was copied to a junior member of the Claimant’s own
team and both were sent to her senior managers. Mr Clark’s evidence is that he did
not respond initially as he had a pre-planned 1:1 meeting with the Claimant on 4
January 2017 and he wished to discuss the matter with the Claimant to determine the
best response.
56 The 1:1 took place as planned on 4 January 2017 and we considered the notes
of that meeting. At the outset, Mr Clark explained that he had invited Ms Badala, a
member of the HR team, to be present because the Claimant had raised a 17 page
grievance making a number of serious allegations against him in his first five weeks in
post. Mr Clark then took issue with the Claimant’s failure to talk to him before raising
the grievance, noted that neither the grievance nor the appeal had been upheld and
Case Number: 3200539/2017
15
referred to the Claimant’s unwillingness to attend mediation. Whilst the decision to
have Ms Badala present was sensible given the previous problems at 1:1 meetings,
the way in which Mr Clark expressed himself was confrontational and unhelpful. His
comments lead us to infer that Mr Clark was irritated by the Claimant’s conduct and
regarded her in a negative manner. Whether caused by hurt or anger, Mr Clark
adopted an unfriendly and hostile attitude to the Claimant from the outset of the
meeting.
57 The first item on the agenda was Teletubbies. The Claimant raised the email
received from Mr Morgan and expressed her concern that she had been excluded and
only became involved when it was too late for her to pick up the issues that fell within
her remit. Mr Clark responded:
“To just clarify why you weren’t involved in the project from the beginning; there was an
opportunity to raise 350K net profit for the TT products. Why weren’t you involved?
Because you didn’t want to engage in a working relationship with me due to your
grievance and the allegations you had raised. I didn’t feel I was in a position to approach
you at the time.
Secondly, I wouldn’t want to sign off on anything that puts the charity at risk, whether
that be financially, its reputation or from a health and safety perspective. It goes without
saying that we ensure we carry out a governance process.”
58 Mr Clark told the Claimant that he was happy with the work she had done. He
acknowledged that the project was brought to the Claimant because it came under her
remit and that he had passed it to her as soon as he became aware that the work
should be handled by the Claimant and the BTL team. The Claimant told Mr Clark that
she found Mr Morgan’s email offensive. The Tribunal considered it telling that Mr
Clark’s initial response was not to express agreement with the Claimant but to ask why
she thought that Mr Morgan had made the comments. The Claimant asked for Mr
Clark’s support and expressed her concern at feeling rushed to sign off the order. Mr
Clark said that he would be supportive of her as a member of his team and agreed that
the words used could be considered offensive. He said that he was happy to respond
but wanted to think of the best way to do so, taking into account the Claimant’s views
which he was happy to give her time to consider. Mr Clark did not tell the Claimant
about the second email or its contents.
59 Mr Clark accepted that everything seemed to be in a rush and that he should
have involved the Claimant or her team sooner. Mr Clark assured the Claimant that he
had worked with other departments to mitigate any risks from making a payment in
advance and to draft a contract which would address the issues. Mr Clark assured the
Claimant that the order would not be approved until the Respondent’s interests were
protected and the Claimant had approved “her side of things”. From the action items
agreed on 20 December 2016, this included testing, packaging and factory audits.
60 The outstanding job descriptions and re-evaluation was also discussed at the
1:1 meeting on 4 January 2017. In late 2016, Mr Clark had agreed to a temporary
enhancement of salary for the three more junior members of the BTL team whilst the
process concluded. In December 2016, Mr Clark notified the Claimant and her team
that he had not been able to review the job descriptions within the anticipated
timescale but would do so without further undue delay. On 4 January 2017, Mr Clark
Case Number: 3200539/2017
16
said that he had now considered the revised job descriptions and understood the roles
and proposals. Mr Clark agreed that the existing job descriptions may be out of date
but, before making a decision on the job re-evaluation, Mr Clark said that he wanted to
review the future BTL trading strategy. Mr Clark agreed to continue the temporary
allowance until that review concluded and proposed a direct meeting with the BTL
team to discuss the topic. The Claimant broadly agreed whilst expressing
disappointment at the delay.
61 On 5 January 2017 it was agreed that that all products would be nickel free as
the Claimant had requested.
62 As requested by Mr Clark in the 1:1 meeting, the Claimant set out her concerns
in two emails which she sent on 5 January 2017. The first email (“the Supplier email”)
was sent to Mr Clark at 12.31. It set out the Claimant’s concerns about the conduct of
Louis Kennedy and a list of 20 actions which she believed were required from the
supplier. Each of the actions listed by the Claimant fell within the scope of her role on
the Teletubbies project as agreed at the meeting on 20 December 2016 and more
generally as head of BTL, for example pre-production samples, clarity on product lines,
outstanding test reports and factory ethical audits, breakdowns of individual testing
cost and product cost per item, declarations of conformity, bills of material, safety
assessments and issues surrounding packaging, artwork, barcodes and again
shipping.
63 In the Supplier email, the Claimant relies upon the first underlined phrase as
information tending to show a breach of a health and safety obligation and the following
underlined phrases as tending to show a breach of legal obligation:
“Given the high risk nature of the product safety in relation to the pre-school target
market, what protection will Barnardo’s post production/post shipment/post receipt of
stock have if the items are deemed to be unsaleable due to QC [quality control] failures?
Our standard payment terms are [x] days net after receipt of stock, which enables us to
address any QC issues as well as late delivery and short delivery prior to releasing any
monies to a supplier.
I note that a contract is now being prepared internally for LK to sign but given the
company’s low credit rating and history, I remain very concerned that how much time and
legal costs could potentially be involved for Barnardo’s to try and recover monies paid out
in advance? …
… The order volumes are very high, especially in view that we have no history of selling
this type of licensed product in Barnardo’s stores. It will be very challenging to sell out
this quantity of stock in the license term of six months. This sell-rate has never been
achieved previously. What happens if we have significant residue stock at the end of the
license term?”
64 The second email was sent at 15.04 to Mr Clark and provided additional internal
queries and actions still requiring clarification and assurance (“the Internal Actions
email”). In this email, the Claimant relies upon the first underlined phrase as
information tending to show a breach of a health and safety obligation and the following
underlined phrases as tending to show a breach of legal obligation:
Case Number: 3200539/2017
17
“…nurseries & primary schools are intended channels to distribute TT product for
Barnardo’s …given 80% of product is not suitable for children under 3 years, is this still
Barnardo’s intention?
…
In addition the licensor request that Barnardo’s maintain and keep an accurate record of
costs incurred by our 3rd Party supply chain.
…
Barnardo’s need to ensure conformity to FR Fundraising Regulator and ensure the code of
conduct is upheld by corporate partners and 3RD party suppliers. It is therefore important
that this code of conduct is included and referenced in the LK contract.
…
The contract for LK as the importer must clearly state the need for LK to have 3rd party
public and product liability insurance to cover liability for a minimal claim not less than
£1million per incident.
…
Re DHX right to cancel/terminate the agreement – failure to agree marketing date ie 2
months after the prototype has been approved by the licensor. BTL needs clarity on this
… has LK received approval from the Licensor already based on prototype samples ie
some in ppt format”
65 Mr Clark forwarded the list of action items from the Supplier email directly to Mr
Morgan on 5 January 2017 under a cover email which simply read: “Here you go….”
This is the same phrase used when forwarding the Claimant’s earlier email on 15
December 2016. Also on 5 January 2017, Mr Morgan sent an email to Mr Clark
responding to each of the points raised by the Claimant. In the email, Mr Morgan
provided assurances that product test reports, ethical and technical factory audits,
individual cost breakdowns safety assessments and the EU declaration of conformity
would be provided as part of the process.
66 Mr Clark did not forward this email to the Claimant, rather he cut and paste the
response to action item 14 (packaging artwork) into a separate email. The Claimant’s
response to Mr Clark expressed concern at the lack of feedback from Louis Kennedy
on the other action items which related to the critical certification required to confirm
the order. Mr Clark still did not provide the full response from Mr Morgan to the
Claimant. We do not accept Mr Clark’s evidence that there was reasonable and proper
cause not to forward the balance of the responses. Mr Clark had asked the Claimant
to send him the email about what remained outstanding, the action items fell within the
agreed scope of the Claimant’s work on Teletubbies, Mr Morgan had provided full
responses in an email which could easily have been forwarded and Mr Clark was
aware that the Claimant remained concerned. We consider that there was no good
reason to fail to send the responses in full to the Claimant.
67 At 23.21 on 5 January 2017, Mr Morgan sent an email to Mr Clark in which he
complained that the Claimant’s action items list implied a further divisive desire to
Case Number: 3200539/2017
18
hijack the process. Mr Morgan concluded: “This is a pure obstruction of the process and if
she hasn’t approved all of this by close of business tomorrow then we shall proceeding without her
approval.” The Claimant was not copied into the email and did not see it before these
proceedings. The Tribunal considered this to be a remarkable email for an external
supplier to send; criticising the Claimant and deciding, as Mr Morgan purported to do,
that the Claimant’s ordinary role in providing approval be dispensed with. Mr Clark did
not respond to the email.
68 On 10 January 2017, Mr Clark sent to his direct reports an email headed: “Retail
and Trading Strategy” and setting out what was described as the new and revised
trading strategy. Mr Clark’s evidence was that this was a draft strategy to be
discussed. However, there is nothing in the email to indicate to the recipients that it
was a draft subject to discussion and agreement. Quite the contrary. Read overall and
considered objectively, the email gives the clear impression of settled strategy which
was being notified to those concerns as something which would be implemented
henceforth. The Tribunal considered this email in making its earlier findings about Mr
Clark’s management style and communication with the Claimant about the Wickford
lease. Whether or not Mr Clark genuinely believed the strategy to be a draft, or indeed
the move from Wickford to be a provisional view, the manner of his communication was
such that an objective employee in the Claimant’s position would consider them settled
decisions already taken.
69 Mr Clark met with the BTL team on 12 January 2017 to discuss the outstanding
issue of the job descriptions and re-evaluation process. Mr Clark made clear that he
would not sign up to the amended job descriptions. The staff expressed their concern
and dissatisfaction. Mr Clark does not deny that his response was to tell them that
they had to “like it or lump it”. The Tribunal find this further evidence of his blunt and at
times insensitive approach to communication on matters of importance to employees.
70 The Claimant and Mr Clark also had a 1:1 meeting on 12 January 2017. When
the Claimant expressed her unease at the presence of a junior member of the HR team
given that this was a dispute between directors, Mr Clark replied that she was not a
director of Barnardo’s. Mr Clarks’ response was factually accurate but again displays a
lack of sensitivity and poor communication skills. The Claimant’s concern was that her
seniority was not being respected, Mr Clark’s reply gave the impression that he was
dismissive of her position as director of BTL even though he later acknowledged that
they were both senior persons in the organisation.
71 The meeting did not go well. Mr Clark expressed his belief that he could not
move forwards with the business as the Claimant was blocking him. Although the notes
suggest that this related to direct discussion with the BTL team, both the Claimant and
Mr Clark gave evidence that it related to the business more generally and specifically
Mr Clark’s belief that that every time he came up with an idea to make more money for
the charity, the Claimant would put something in the way to stop it. The Claimant
became upset and there was a short break. The meeting reconvened and discussion
moved to the Teletubbies contract. The Claimant raised the lack of response from
Louis Kennedy to all but one of her list of supplier actions sent on 5 January 2017.
Still, Mr Clark did not tell her that replies and assurances had been received on each.
Mr Clark advised the Claimant at least twice that the contract and legal aspects of the
agreement would be dealt with by the company secretary and external solicitors and
Case Number: 3200539/2017
19
assured her that the contract would not be signed until everything was in order.
72 The Claimant expressed concern about the way in which Mr Morgan treated her,
including the offensive email he had sent. Mr Clark’s reply (which he maintained in
evidence at this Tribunal) was that he spoken to Mr Morgan on 5 January 2017, the
day after the 1:1 meeting, and told him in clear terms that his email about the Claimant
was unacceptable. Mr Clark said that Mr Morgan knew that he had crossed a line and
was very apologetic. We do not accept Mr Clark’s evidence that he had already
spoken to Mr Morgan before this second 1:1. It is not credible that if such a
conversation had taken place, Mr Morgan felt able to send a similarly unpleasant email
about the Claimant to Mr Clark that very same night. On balance, we find that Mr Clark
did not speak to Mr Morgan until the Claimant pressed the matter on 12 January 2017.
This is consistent with Mr Clark’s email on 13 January 2017 requesting that Mr Morgan
apology, which he then did later that day.
73 In his oral evidence, but not in his written witness statement, Mr Clark’s
evidence was that the Respondent was provided with the ethical and technical factory
audit reports on 13 January 2017 and that he and the company secretary spent threequarters
of a day considering their contents. Mr Clark did not tell the Claimant that
they had been received nor did he provide her with copies, despite it being agreed on
20 December 2016 that this would be part of her role on the Teletubbies project. We
infer that Mr Clark made a conscious decision not to pass the reports to the Claimant
as he was concerned that she might identify issues and cause further problems with
Louis Kennedy.
74 A 1:1 meeting on 25 January 2017 did not proceed as the Claimant wanted to
be accompanied by a solicitor which the Respondent considered inappropriate.
75 On 2 February 2017, the Claimant was copied into an email from Mr Morgan to
Mr Clark which confirmed that the Respondent had paid Louis Kennedy and they would
now proceed to full production. The Claimant had not given her approval or signed off
on her areas of concern. Mr Clark had not told the Claimant in advance that the money
was to be paid and the email came as a total surprise to her. This was the last straw in
the Claimant’s mind and she decided to resign.
76 In her resignation letter dated 3 February 2017, the Claimant set out in detail her
belief that she had been sidelined and excluded from the Teletubbies project which
would normally have fallen within her remit, her position had been undermined
internally and externally, she had been called a “blocker” in a 1:1, Mr Clark had
proposed changes without proper consultation, refused to agree the job description
and re-evaluation, failed to comply with normal procedures for due diligence or to
respond to her concerns. The Claimant complained that Mr Clark had not sufficiently
supported her in the face of Mr Morgan’s offensive remarks when she was trying to
carry out her job, had not given her the required testing and factory audit reports and
that she had received only one response to her list of supplier action points. The
Claimant expressed her general unhappiness with Mr Clark’s manner and early
decisions, such as the Wickford lease. Ultimately this and the decision to pay the
money on the Teletubbies contract without telling her or dealing with her deep and
genuine concerns had led her to resign. The Respondent accepted the Claimant’s
resignation.
Case Number: 3200539/2017
20
77 On 7 February 2017, Mr Clark re-sent the Supplier email to Mr Morgan asking
for his further comments in light of the Claimant’s complaint that the contract had been
signed before the outstanding points had been correctly actioned. Mr Morgan’s replies
confirmed that the outstanding reports and certificates had been provided (other than
testing which he said could not be done before the contract was signed) and that the
contract had been signed on 1 February 2017.
Law
Constructive Dismissal
78 Section 95(1)(c) ERA provides that a dismissal occurs if the employee
terminates the contract under which they are employed (with or without notice) in
circumstances in which they are entitled to do so by reason of the employer's conduct.
Whether the employee was entitled to resign by reason of the employer’s conduct must
be determined in accordance with the law of contract. In essence, whether the conduct
of the employer amounts to a fundamental breach going to the root of the contract or
which shows that the employer no longer intended to be bound by one or more of the
essential terms of the contract, Western Excavating Ltd v Sharp [1978] IRLR 27 CA.
79 The term of the contract which is breached may be an express term or it may be
an implied one. The Claimant relies upon alleged breaches of express and implied
terms, including that of trust and confidence. This requires that the employer shall not
without reasonable and proper cause conduct itself in a manner calculated or likely to
destroy or seriously damage the relationship of trust and confidence between employer
and employee. The employee bears the burden of identifying the term and satisfying
the tribunal that it has been breached to the extent identified above. The employee
may rely upon a single sufficiently serious breach or upon a series of actions which,
even if not fundamental in their own right, when taken cumulatively evidence an
intention not to be bound by the relevant term and therefore the contract. This is
sometimes referred to as the “last straw” situation. This last straw need not itself be
repudiatory, or even a breach of contract at all, but it must add something to the overall
conduct, Waltham Forest London Borough Council –v- Omilaju [2005] IRLR 35.
80 Where a contract has been reduced into writing, implication of additional terms
is only possible to give business efficacy to the contract, or where necessary to give
effect to an obvious combined intention of the parties or where it is a necessary
implication to complete the contractual arrangements, United Bank Limited v Akhtar
[1989] IRLR 507 per Knox J at paragraph 48.
81 The question of fundamental breach is not to be judged by reference to a range
of reasonable responses, Buckland v Bournemouth University Higher Education
Corp [2010] IRLR 445, CA. The tribunal must consider both the conduct of the
employer and its effect upon the contract, rather than what the employer intended. In
so doing, we must look at the circumstances objectively, that is from the perspective of
a reasonable person in the claimant’s position. The question of fundamental breach is
not to be judged by a range of reasonable responses test.
82 In Tullett Prebon Plc v BGC Brokers LLP [2010] EWHC 484 QB, Jack J
Case Number: 3200539/2017
21
stated at paragraph 81 that the conduct must be so damaging that the employee
should not be expected to continue to work for the employer and that:
“Conduct, which is mildly or moderately objectionable, will not do. The conduct must go to
the heart of the relationship. To show some damage to the relationship is not enough.”
83 Establishing breach alone is not sufficient: the employee must also resign in
response to it and do so without affirming the contract. Once an employee has
affirmed the contract, the right to repudiate is at an end. As summarised in Chindove
v William Morisons Supermarket plc UKEAT/0201/13/BA, the issue is whether the
employee has demonstrated by conduct or delay that he has chosen to hold the
employer to the contract. This is more an issue of conduct than time, with the latter
relevant where the employee continues to work for longer than the within he might
reasonably be expected to exercise his right. There is no automatic time, it all depends
upon context. Part of the context is the employee’s position, such as the effects upon
his finances, domestic arrangements and the ease with which employment may be
found elsewhere. Another part of the context is whether the employee was actually at
work or was off sick.
84 The employee must satisfy the tribunal that he left in consequence of the
employer's breach of duty. There may be more than one reason why an employee
leaves a job; it is enough that the repudiatory breach was an effective cause with no
requirement that it be the most important cause, Wright v North Ayrshire Council
[2014] IRLR 4.
Protected Disclosure
85 A qualifying disclosure requires a ‘disclosure of information’ which in the
reasonable belief of the worker tends to show, amongst other things, that the health or
safety of any individual has been, is being, or is likely to be endangered, s.43B(1)(d)
Employment Rights Act 1996 or a legal obligation breached, s.43B(1)(b).
86 At the time when the Tribunal heard submissions, it had regard to the
Employment Appeal Tribunal Judgment in Kilraine v LB of Wandsworth [2016] IRLR
which cautioned some care in the application of Cavendish Munro Professional
Risks Management Ltd v Geduld [2010] IRLR 38 where the Employment Appeal
Tribunal drew a distinction between an allegation and conveying information: the
question is simply whether there is a disclosure of information as required by the Act,
that it is also an allegation is nothing to the point. On 21 June 2018, the Court of
Appeal agreed that approach. The Tribunal must look at the words used by the
Claimant to decide whether they convey information (and an allegation may contain
information); words which are too general and devoid of factual content tending to
show breach of a legal obligation will not amount to information. Words which
otherwise fall short may be boosted by context or surrounding communication. The
assessment is an objective evaluation in all of the circumstances of the case.
87 The Claimant must reasonably believe that the information tends to show a
relevant breach and that it is in the public interest to make the disclosure. The belief
that a disclosure is in the public interest must actually be held at the time of the
disclosure; whether or not it was a reasonable belief may include consideration of
Case Number: 3200539/2017
22
matters not in his mind at the time and it need not be the only or predominant
motivation in making the disclosure, see Chesterton Global Ltd v Nuromohamed
[2017] IRLR 837 at paragraphs 27 to 31 and 37.
88 The requirement for reasonable belief, which should not be conflated with good
faith which is addressed below, involves an objective standard by reference to the
circumstances of the discloser, including their qualifications, knowledge of the
workplace and experience, Koreshi v Abertawe Bro Morgannwg University Local
Health Board [2012] IRLR 4, EAT.
89 In Blackbay Ventures Ltd v Gahir [2014] IRLR 416, the EAT gave helpful
guidance as to the approach to be adopted by a Tribunal considering a protected
disclosure claim. This emphasised the need not to adopt a rolled up approach but to
consider each disclosure by date and content, identify the risk to health and safety in
each case and the detriment (if any) which is caused thereby. The need to apply this
detailed analysis was confirmed in Patel v Surrey County Council UKEAT/0178/16.
90 The correct approach to causation and the different tests which apply to
dismissal and to detriment claims was set out in Fecitt v NHS Manchester [2012]
IRLR 64 per Elias LJ at paragraph 45 (and applied in Patel). Whereas the Tribunal
must decide whether the protected disclosure was the sole or principal reason for
dismissal (Eiger Securities LLP v Korshunova [2017] ICR 561), it is enough that the
disclosure materially influenced the Respondent’s treatment of the Claimant in a
detriment claim. If the Tribunal finds that the reason given by the Respondent is false,
it may be appropriate to draw an adverse inference.
91 The time for bringing a s.47B is three months from the date of the detriment, or
last detriment where there has been a serious of similar acts or failures. A tribunal may
still hear such a claim even if presented late so long as it is satisfied that it was not
reasonably practicable to have presented the claim in time and that it presented within
a reasonable time thereafter.
Conclusions
Did the Claimant make a protected disclosure?
92 The first protected disclosure relied upon is the Claimant’s email sent on 23
December 2016. We agree with Ms Crasnow that there is an element of overlap with
the points being raised by the Claimant at the meeting on 20 December 2016.
However, we do not accept that the Claimant is merely repeating her opinions on
matters which had not previously been accepted. In the email, the Claimant sets out
the reasons for her concerns, providing information to support her belief that there is a
potential health and safety risk. For example, with regard to product testing standards,
the Claimant conveys information that Louis Kennedy was insisting that nickel free was
not required for product which did not touch the skin, she had checked with external
advisors who had confirmed that the product met the EU definition for contact and
required testing. Similarly, the Claimant conveyed information when she said that
labelling artwork had been produced before testing, it had been approved without
independent review and approval, in the context of a breach of normal sourcing
procedure. Taking a further example, as context the Claimant says that the supplier
Case Number: 3200539/2017
23
has not confirmed standards against which the products are to be tested for
compliance before stating that pre-production certification at each factory should be
available but none has been supplied. Objectively considered and properly read in
context, even if the Claimant is sharing her opinion she is also conveying information.
The same applies for each of the six phrases relied upon.
93 As well as conveying information, the Claimant must also reasonably believe it
to tend to show a relevant breach and to be in the public interest. The belief of an
employee is an essential component in a protected disclosure and shows the extent to
which there may be an overlap between information, allegation and opinion. It was
agreed on 20 December 2016 that the product testing, adequacy of samples and
factory audits would all fall within the Claimant’s remit on the Teletubbies project. The
Claimant’s belief was borne of her extensive experience with BTL sourcing new
product, even if from only one supplier previously. We also took into account the late
stage at which the Claimant had become involved and the pressure upon her to
approve the order quickly. These are relevant circumstances in leading us to conclude
that she was reasonable in her belief that there were outstanding issues around
product safety which had not yet been addressed. As for public interest, the
Respondent is a charity, accepting public donations and marketing items for sale to the
public who wished to support its charitable works. The products being sourced were to
be linked to a fundraising initiative and marketed at children as well as adults. We
have no hesitation in finding that the Claimant held a reasonable belief that her
disclosures in this email were in the public interest.
94 Turning to the Supplier email sent on 5 January 2017, and the first phrase about
the high risk nature of the product, at first glance and in isolation this may be seen as a
mere allegation rather than information. However, we reminded ourselves that the two
are not necessarily mutually exclusive and we must consider the context and
surrounding communication. The paragraph in which the phrase is used goes on to
consider quality control failures and the need for a delay between receipt and payment
to address these, before listing outstanding supplier actions on product testing and
compliance. Objectively considered in the circumstances of the case, we consider that
the Claimant was conveying information about product safety which tended to show a
possible breach of health and safety obligations in selling products to pre-school
children. For the reasons set out above, about the nature of the product, the nature of
the Respondent organisation, the time pressure and the Claimant’s experience, we
again accept that she held a reasonable belief that her information tended to show a
likely breach of health and safety which was in the public interest.
95 As for the other phrases which are relied upon, we accept that there was
information conveyed in the sense that the Claimant was stating that Louis Kennedy
had a low credit rating and history, in the context of assessing the wisdom of making a
large advance payment and the cost of trying later to recover the same. The Claimant
also conveyed information that the product volume was higher than usual given that it
was a new type of product which required sale in a specified time period, something
not previously achieved. The Claimant was genuinely and subjectively concerned
about the wisdom of an agreement to make an advance payment and the commercial
and reputational risk to the Respondent. However, s.43B requires that the Claimant
reasonably believed there to be a breach or likely breach of legal obligations. On this
point we preferred the submissions of Ms Crasnow that reputational risk is not the
Case Number: 3200539/2017
24
same as legal obligation. It had been agreed on 20 December 2016 that negotiation
and agreement of commercial terms would be undertaken by finance and the company
secretariat. The Claimant was an experienced business woman, there was no
reasonable basis for her to believe that the contract would not be properly negotiated
not least as at that time she had been told that she would be responsible for approval
of testing and compliance requirements. Nor do we consider that the Claimant could
reasonably have believed that such matters were in the public interest.
96 The third alleged protected disclosure is the Internal actions email. As with the
Supplier email, we consider that the Claimant conveyed information only in respect of
the first phrase. The information was that the products being ordered were not suitable
for 80% of target market of children under three years old, in the context of the rest of
the paragraph which refers to the Respondent’s intention to use nurseries and primary
schools as channels to distribute the Teletubbies product. For the same reasons as
with the previous two emails, we accept that the Claimant had a reasonable belief that
the information about the unsuitability of the product tended to show a potential breach
of health and safety which was in the public interest.
97 As for the other phrases relied upon, the Claimant is identifying matters which
need to be provided by the Respondent and Louis Kennedy to ensure compliance with
the licence agreement. Even if this is a disclosure of information, it cannot reasonably
have been believed by the Claimant to tend to show a breach, or likely breach of a
legal obligation. As with the Supplier email, the Claimant had been reassured that
contractual matters were being handled by the company secretariat. The Claimant’s
input from experience about the record keeping requirements may have been sensible
but, in our view, it falls far short of information tending to show that these records would
not have been kept and the licence agreement breached.
98 The Claimant made a protected disclosure in her email of 23 December 2016
and the Supplier email on 5 January 2017, the latter in respect of product safety only.
Was the Claimant subjected to a detriment because of a protected disclosure?
99 The detriments relied upon in this claim are more limited than those in the
constructive dismissal claim. We must consider whether any of these were detriments:
(i) the Claimant was undermined when not allocated duties previously in her remit,
specifically the failure to share with her all but one of the Louis Kennedy responses to
her action items and/or the internal actions proposed in respect of her email; (ii) the
Claimant was undermined to Louis Kennedy, specifically in Mr Clark’s response to the
offensive emails; and (iii) the admitted reference to the Claimant as a blocker at the 1:1
on 12 January 2017 in front of a junior member of HR.
100 We have found as a fact that the action items in the Supplier email all fell within
the agreed role of the Claimant on the Teletubbies project, that Louis Kennedy
provided responses to each and that Mr Clark provided only one of the responses to
the Claimant. We have also found that the Claimant repeatedly expressed concern
about the lack of full response, including at the 1:1 on 12 January 2017. The
Claimant’s concerns about the safety of the products for sale and the relationship with
Louis Kennedy continued as a result and caused her a justifiable sense of grievance.
In the circumstances, we accept that the failure to provide the full responses was a
Case Number: 3200539/2017
25
detriment.
101 In deciding whether the detriment was because of a protected disclosure, we
bear in mind that the latter must be a material and effective cause and that it is for the
Respondent to show the ground on which the failure to act was done, s.48 ERA 1996.
The Tribunal has rejected Mr Clark’s explanation that he did not forward the full email
because the other responses did not fall within the Claimant’s area of responsibility.
We do not accept that Mr Clark could genuinely have believed that, given the areas of
responsibility agreed by the Respondent on 20 December 2016 in the exercise of its
broad discretion about the allocation of work. Moreover, the email from the Claimant
with her action items came at Mr Clark’s request following the discussion on 4 January
2017 in which he accepted that the Claimant should have been involved sooner as the
work came under her remit and that the contract would not be signed under she had
approved “her side of things”. There was no good reason for Mr Clark’s failure to
forward the responses in full.
102 Ms Crasnow submitted that the protected disclosure could not be an effective
cause as Mr Clark had also failed to provide the Claimant for answers to her questions
emailed on 14 December 2016. We do not agree. Whilst Mr Clark did fail to provide
the Louis Kennedy responses at that time, a large number of her questions related to
the commercial terms of the agreement as well as matters such as product testing and
factory audits. At that time, the Claimant had only recently become involved in the
project and the extent of her role was not yet defined. A meeting to discuss her
concerns and the Louis Kennedy response was already arranged for the following
week. Whilst Mr Clark may genuinely have believed on 15 December 2016 that the
Claimant did not need to see the responses, the same did not apply to the responses
to the 5 January 2017 for the reasons we have set out above. By 5 January 2017, Mr
Morgan firmly believed that the Claimant was obstructing the process and had declared
that if she did not give her approval, they would proceed without her. He had
expressed his belief in strong terms to Mr Clark. Mr Clark had not defended the
Claimant nor told Mr Morgan that his emails were inappropriate. On balance, we infer
that the reason why the full responses were not provided is because Mr Clark was
concerned that the Claimant would raise further concerns and challenges to the
adequacy of the responses which may further delay the signing of the contract and
further enrage Mr Morgan. Given the irritation and pressure being expressed by Mr
Morgan and desire of Mr Clark to move matters forward swiftly, we are satisfied both
protected disclosures, which related to the adequacy of testing and compliance each
matters addressed in Mr Morgan’s response, was a material and effective reason.
103 By contrast, we do not accept that the Respondent failed to share with the
Claimant the internal actions proposed in response to her internal actions email. In the
1:1 on 12 January 2017, Mr Clark told the Claimant that the contract and commercial
implications of the agreement would be dealt with by him, Ms Simmons and the
company secretary. Insofar as Mr Clark did not give specific responses to the
questions which the Claimant had raised, these were not matters within the agreed
remit of her role on the Teletubbies contract. Moreover, the Claimant had previously
been assured that the contract was being considered by external lawyers. Any queries
which she had raised would be dealt with by others. The Claimant was not being
undermined and she cannot have had a legitimate sense of grievance in all of the
circumstances.
Case Number: 3200539/2017
26
104 As for undermining her in front of Louis Kennedy, the Claimant relied in her
submissions upon the Respondent’s failure to respond promptly to Mr Morgan’s emails
on 3 January 2017. There was no evidence before us that either Mr Clark or Ms
Parkes challenged Mr Morgan or sought to support the Claimant upon receipt of either
email. The Claimant was a senior employee, a statutory director of BTL and was
seeking to perform her duties as agreed on 20 December 2016 on the Teletubbies
project. Mr Morgan clearly regarded her intervention as negative and made a number
of offensive remarks about her. We found that Mr Clark did not speak to Mr Morgan
until pressed by the Claimant on 12 January 2017 who was raising her upset for the
second time. We accept that the failure to challenge these is capable of amounting a
detriment, at least in respect of the one email about which the Claimant knew.
105 In deciding whether this failure by Mr Clark and the Respondent generally was
caused by either of the protected disclosures, we considered the nature and tone of Mr
Morgan’s communications with Mr Clark concerning the Claimant even before the
disclosure. Whilst the working relationship between Mr Grant and the Claimant was
never warm, the personal hostility evidenced in the email on 3 January 2017 was
markedly different from his email on 15 December 2016 that the Claimant was trying to
find procedural flaws and any disagreement in the emails on 22 December 2016. Mr
Morgan’s irritation was because he regarded the Claimant’s queries as obstructive. In
the absence of any other credible explanation from the Respondent, and given his
references to her as a blocker, we infer that Mr Clark shared this view. An effective
cause of his belief was the Claimant’s protected disclosures about health and safety.
106 It is accepted that Mr Clark referred to the Claimant as a blocker in the meeting
on 12 January 2017 because he regarded her as obstructing his ideas to make more
money for the charity. The Teletubbies project was a major initiative and one such
attempt to make money. We conclude that Mr Clark had this in mind when he made
his comment. The Claimant was raising concerns about matters which she reasonably
believed required addressing in order to ensure that the product was health and safety
compliant. We are satisfied that in such circumstances, Mr Clark’s comment was a
detriment and that the protected disclosures were a material and effective cause for
him making it. As for the email on 13 January 2017, Mr Clark asked Mr Morgan to
apologise for his conduct. We accept Ms Crasnow’s submission that it is entirely
neutral and do not consider that the tone or content of that email was such that a
reasonable employee could justifiably have felt aggrieved by it.
107 For these reasons, we are satisfied that the Claimant was subjected to a
detriment when she was undermined, both by not being given the supplier responses
to her questions and in not being supported by Mr Clark in response to the 3 January
2017 offensive email, and also when she was called a blocker. All arose from a belief
by Mr Clark that the Claimant in her protected disclosures was obstructing the
agreement which he was very keen to conclude. This was not a one-off failure but a
failure which extended over the period continuing until the Claimant’s resignation on 5
February 2017.
108 If we are wrong on that point and the date of the last detriment was indeed 12
January 2017, as Ms Crasnow contends, we would have taken into account the extent
to which the Claimant was misled by Mr Clark about the detriments at the time. It was
Case Number: 3200539/2017
27
only in the course of these proceedings that additional documents were disclosed
which made the true position clear: Mr Clark did not tell the Claimant that there had
been a response by Louis Kennedy to her supplier action items, he told her that he had
spoken to Mr Morgan on 5 January 2017 whereas the email that night from Mr Morgan
led us to find that he had not and he assured the Claimant that the contract would not
be signed until she had approved the matters within her remit when in fact he signed it
anyway. In such circumstances, even if the last detriment relied upon occurred on 12
or 13 January 2017, we would have accepted that it was not reasonably practicable for
the Claimant to have brought her claim within the three month limitation period by
reason of the Respondent’s conduct and that the claim was brought within a
reasonable time thereafter.
Constructive dismissal
109 The Claimant relies upon 11 items of conduct which she says amounted to a
breach of the implied term of trust and confidence. We bear in mind that when
considering the implied term of trust and confidence, it is conduct which is without
reasonable and proper cause which is capable of amounting individually or
cumulatively to a repudiatory breach. Ms Crasnow submitted that the Respondent
retained a broad contractual discretion in the allocation of work, the substantive
exercise of which could only be challenged if Wednesbury unreasonable. Both she
and Ms Ismail agreed, however, that the manner in which the discretion was exercised
is nevertheless subject to the implied term of trust and confidence.
110 The Tribunal found as a fact that Mr Clark did make a decision to close the
Wickford office without prior consultation. The desire to save cost and improve
business efficiency by moving the BTL team to work more closely with the broader
retail team is a reasonable and proper cause for an office move and within the
discretion of the Respondent. The manner in which Mr Clark approached this, by
presenting it as a “done deal” by 12 August 2016 was not appropriate and was, we
consider, conduct which contributed to a breach of the implied term of trust and
confidence.
111 We found that Mr Clark did not sign off the new job descriptions and did not
consider them by the end of 2016 as agreed. In January 2017 he then deferred a
decision further until a review of the future BTL trading strategy. Mr Clark was new in
post, it was reasonable and proper for him to want to take some time to understand
how BTL worked and to assess the future direction of the business. We accept the
disappointment and frustration of the employees who were hoping for a re-evaluation
but we also take into account the agreement of the Respondent to pay a temporary
allowance pending a final decision. This was a reasonable and balanced approach
and it did not undermine the Claimant in the eyes of her team. In the circumstances,
we do not consider this to be conduct capable of contributing to a breach of the implied
term of trust and confidence.
112 As for Mr Clark’s manner in meetings with the Claimant, we have found it to be
blunt, dismissive and demonstrating irritation. On 4 January 2017, Mr Clark was
hostile and unfriendly. We have not, however, accepted that it was bullying or
intimidating. The Tribunal inferred from our primary findings of fact above that from
very early in the working relationship there was a genuinely held difference of opinion
Case Number: 3200539/2017
28
between the Claimant and Mr Clark as to what was best for BTL. Mr Clark had come
into his job full of new ideas to drive BTL forward, to bring it closer to the main Retail
and Trading operation from which it had become rather separate and to revitalise a
business which was languishing in its own comfort zone. By contrast, the Claimant
was highly proud of the successful business that she had built up largely autonomously
and which was one of the most profitable parts of the Respondent’s operation. Mr
Clark was not open and consultative in his management style but blunt and, at times,
dismissive. The Claimant perceived this as bullying and intimidating even though that
was not Mr Clark’s intention. The Claimant was passionate about her view that the
current manner of operating was successful and did not need to be changed. Mr Clark
perceived this as being resistant to change and obstructive. It was this difference in
opinion and communication difficulty from the very outset which lies at the heart of
much of what then followed. Overall, we consider that whilst Mr Clark’s intentions were
reasonable the manner in which he spoke to the Claimant at meetings was not. It was
conduct which contributed to a breakdown in trust and confidence.
113 The Claimant’s concerns about Mr Clark’s conduct caused her to raise a
grievance very early in their working relationship. When hearing the grievance, Mr
Pemberton interviewed the Claimant, Mr Clark and Ms Parkes. He did not interview
Ms Vary or Mr Anderson and the Claimant did not suggest that he should do so. Mr
Pemberton accepted Mr Clark’s evidence without giving reasons and gave the
impression that he had not taken into account the Claimant’s years of service without
problems with previous managers. On appeal, Mr Cripps acknowledged Mr Clark’s
different leadership style and that the Claimant may have to adjust. Mediation was
offered but did not take place. Whilst we think that Mr Pemberton could have
explained his findings in more detail and Mr Cripps could have acknowledged that Mr
Clark may also need to adjust his style, overall we do not consider that there was a
failure properly to investigate the grievance or appeal.
114 The existing difficulties in the working relationship and communication between
the Claimant and Mr Clark were exacerbated by the Teletubbies project. There was no
dedicated project team for the Teletubbies contract from which the Claimant was
excluded. It appears to have been an ad hoc and reactive process rather than a
planned project. This may have arisen from the inexperience of the newly arrived
management team, including Mr Clark, who were not fully aware of the role of BTL in
sourcing and purchasing new goods. However, it must have been apparent to Mr
Clark that the BTL team should have been involved before 13 December 2016. Not
least as the Claimant’s approval was required for the advance payment and there
remained a lot of work to be done on testing, packaging and logistics. This was a
significant sum of money for BTL to pay on behalf of the Respondent and the Claimant
owed statutory duties of good governance as a director of BTL. It was not reasonable
or proper for the Respondent to leave it until 13 December 2016 to involve the
Claimant and only then by expecting her to approve the payment the same day.
115 Mr Clark’s explanation to the Claimant on 4 January 2017 was that she had not
been involved sooner because of her grievance and that she should have been as it
was work which came under her remit. This is consistent with our conclusion that Mr
Clark must have known before December 2016 that BTL should be involved and that
the testing, sampling and packaging work was within the Claimant’s ordinary job role.
We infer that had it not been for the need for the Claimant to sign off the payment, Mr
Case Number: 3200539/2017
29
Clark would not have included her at any point in the Teletubbies contract. His conduct
is consistent with an intention to deal directly with the trading aspects of the project, in
particular the decision making, and not to involve the Claimant. Mr Clark’s attempt to
bypass the Claimant was, in part, an emotional response born of his unhappiness at
the Claimant’s grievance and their difficult strained working relationship. It was also, in
part, because he regarded her as difficult and an obstacle to his attempts to his new
ideas for making money for the business. This is consistent with his comment on 12
January 2017 that she was a blocker and we repeat our conclusions from paragraphs
105 and 106 above on this point.
116 The Claimant argued that her role as head of BTL also meant that she should
have been permitted to review the supply contract and, essentially, to be involved in
the contractual negotiations and payment terms on Teletubbies. We accept that this
was work which the Claimant undertook on the ordinary range of goods sourced by
BTL, sourced from its single supplier Creative Tomco. The Teletubbies contract was
very different from the ordinary business of BTL. Taking into account the complexity,
financial value, size and importance of the Teletubbies contract, and the requirements
of the DHX licensing agreement, we consider that the Respondent had reasonable and
proper cause to decide that its lawyers, finance team and company secretary should
be tasked to deal with the contract and commercial risk. This decision was
communicated to the Claimant on 20 December 2016 when the roles on the contract
were agreed. The Claimant did not object and we consider that this was because she
understood the different nature of this contract from “business as usual” in BTL. We do
not accept Ms Ismail’s submission that the Claimant’s duties were removed without
proper explanation or that she was prevented from exercising her proper role in respect
of these parts of the Teletubbies project.
117 Once the Claimant became involved in the Teletubbies project, she was able to
influence some of the key decisions, for example whether products should be nickel
free and the cost of testing. The email exchanges between the Claimant and Ms Geller
were detailed and the Claimant’s involvement appropriate. The problem arose once Mr
Morgan assumed responsibility for Louis Kennedy’s role over the Christmas period and
into January 2017. As we have considered above in the context of the protected
disclosure claim, the Claimant had raised a number of outstanding supplier actions
which related to matters within the scope of her agreed role on Teletubbies. Mr
Morgan provided responses to each question; Mr Clark sent only one of these to the
Claimant. Furthermore, we have found that Mr Clark was provided with the factory
audit reports on 13 January 2017 but did not send them to the Claimant for her
consideration. In these two respects, Mr Clark did prevent the Claimant from
exercising her proper role on the Teletubbies project. He did so because he was
concerned that the Claimant might raise further concerns and he regarded her as an
obstacle to progress.
118 Overall, we accept that Mr Clark was dismissive of the Claimant’s concerns and
accept that he failed to have reasonable regard to the points that she was raising and
to consider whether they had merit. Mr Clark gave the impression, from
contemporaneous documents and in his evidence, that he was keen to press on with
the agreement with Louis Kennedy irrespective of the concerns being raised by the
Claimant and which he considered to be unhelpful. Indeed, despite his assurances to
the contrary given to the Claimant, he proceeded to approve the advance payment
Case Number: 3200539/2017
30
before she had approved the testing and factory audit regime. This was conduct
without reasonable and proper cause which contributed to a breakdown in the
relationship of trust and confidence.
119 Finally, the Claimant asserts that she was undermined in front of Louis
Kennedy. In developing this point in submission, Ms Ismail relied upon all three
offensive emails sent by Mr Morgan and what she regards as the Respondent’s
inadequate support of the Claimant in response. We have found that neither Mr Clark
nor Ms Parkes responded to the first two emails to defend the Claimant. Nor have we
accepted that Mr Clark spoke to Mr Morgan about his inappropriate conduct until after
the 1:1 on 12 January 2017. We do not accept Ms Crasnow’s submission that it was
appropriate for Mr Clark not to respond immediately to the rude late night emails.
Whatever Mr Clark’s view of the Claimant, there was no reasonable and proper cause
not to challenge what even he regarded as offensive and entirely inappropriate emails
about a senior member of his team. The test is contractual; did the Respondent’s
conduct have the necessary effect? It does not, it seems to us, matter that the
Claimant was aware of only one of the emails when considering the effect of the
conduct. This was conduct capable of contributing to a breach of the implied term of
trust and confidence.
120 Having considered the individual aspects of conduct relied upon by the
Claimant, we then considered whether or not cumulatively they were of such severity
that they amounted to a fundamental breach of conduct. In doing so, we considered
the objectively reasonable employee in the Claimant’s circumstances. This would be a
senior employee with over 20 years’ good service and no previous problems with line
managers who had headed a trading business which generating a healthy profit and
without suggestion of underperformance. We consider that such an employee would
reasonably consider Mr Clark’s conduct to amount to a repudiatory breach of the
implied term of trust and confidence, given his newness to the business, failure to
consult properly with the Claimant and his manner of communicating with her, initially
not including her on Teletubbies in part because she had raised a grievance, then
failing properly to consider her concerns and not supporting her in front of the supplier
in the face of clearly offensive emails sent to her more senior and junior colleagues.
This was not conduct which was mildly objectionable but rather conduct which went to
the heart of the relationship.
121 The Claimant resigned on 3 February 2017, having been told that the payment
in advance had been made even though she had not signed off the matters which had
been agreed as within her remit. Having regard to the content of her resignation letter
which relied upon the objectionable conduct which we have accepted, we conclude
that the Claimant did resign in response to the breach. She did not delay unduly and
did not conduct herself in a way which affirmed the contract. The Claimant had
repeatedly been assured that she would see the testing and factory reports before
payment was approved; this was part of her agreed job and she was entitled to believe
the Respondent’s assurances. When she found out that they had been broken, the
Claimant resigned immediately in circumstances where she was entitled to treat herself
as dismissed.
122 Having accepted that the Claimant was dismissed, we must consider the reason
for dismissal. We remind ourselves that the protected disclosure must be the sole or
Case Number: 3200539/2017
31
principal cause for dismissal, here the resignation by reason of the Respondent’s
conduct. The Claimant asserts that it was because of her protected disclosures. Of
the conduct relied upon by the Claimant as amounting to a repudiatory breach, we
have accepted that the failure to share with her the full Louis Kennedy reply, not being
supported by Mr Clark in response to the offensive emails and when she was called a
blocker were because of her protected disclosures. We do not underestimate the
importance of these detriments and the upset and distress they caused the Claimant.
Nevertheless, we regard these as being conduct which largely confirmed to the
Claimant her sense of being undermined dating back to the grounds for her original
grievance. The Claimant’s late inclusion on the Teletubbies project and the ongoing
dispute about the job descriptions were nothing to do with her protected disclosure. Ms
Ismail submits that there is a distinction between the nature of Mr Clark’s attitude and
conduct before and after the protected disclosures. We disagree and have set out our
conclusion that the problems and difficulties experienced started from very early in the
working relationship. Overall, we are not satisfied the protected disclosures were the
principal reason for the conduct which we have found to amount to a dismissal.
123 The Respondent has not proven a potentially fair reason for dismissal and the
claim for ordinary unfair dismissal contrary to section 98 of the Employment Rights Act
1996 succeeds.
Next steps
124 The case will now be listed for a remedies hearing. Within 28 days of receipt of
this Judgment, please provide dates to avoid for a one day hearing between November
2018 and February 2019. The parties are to exchange documents no later than 28
days prior to the hearing and to provide any additional witness statements from which
they intend to reply no less than 14 days before that hearing. If any further case
management orders are required, the parties should write to the Tribunal and a
telephone Preliminary Hearing will be listed.
Related Parties